logo
  • Home
  • His life ...
    • Biography
    • Curriculum Vitae
    • Book: “Maximilien au Désert” NEW !
  • His work ...
    • Books
    • Expos
    • Painting
    • Embossings
    • New Year's wishesNEW !
    • Online ExhibitionsNEW !
    • Slideshows
  • Media ...
    • Documentation
    • Videos
    • Contact
  • Photo Gallery ...
    • All Photos
    • -
    • Sahara Rock Art completed
    • Tuareg
    • Pueblos
    • Northwest Indians
    • Peru
    • The culture of the Incas
    • Pre-Inca cultures
    • The Andes
    • Argentina
    • Gauchos
    • Central America
    • Sahara 1962-1975
    • Sahel
    • Sahara : Tassili - Tadrart 1993
    • From the Ténéré to the Aïr Mountains NEW !
    • In the dunes of Erg Izane NEW !
    • Across the Tamgak Mountains NEW !
    • From Adrar Bous into the Tamgak Mountains NEW !
    • With the Tuareg on the edge of the Tamgak Mountains NEW !
    • Building a Tataram: Documentation NEW !
  • Comments
    flag flag flag flag    

Description

  • Foto Number: ZAM-012

One of the two locks at Miraflores on the Panama Canal. You can see an Ecuadorian ship from Guayaquil. The manoeuvre from one lock to the other takes about an hour. The operation requires about 100 000 tonnes of water. Each lock gate is nine metres high and weighs 750 tonnes. The ship is pulled on both banks by 50-tonne tractors - they are called mulas (mules). The tractors are equipped with 75 HP electric motors. The Panama Canal measures 82 kilometres and covers an area of 250 square kilometres. It usually takes six to eight hours to navigate. This waterway was opened in 1914. Since the opening of the extension, which began in 2007, on 26 June 2016, ships with 14,000 TEU can pass through it. To date, more than one million ships of all types from all over the world have used it. - 1977

  • Keywords:
    Central America Panama Panama canal ship sluice ship

Description

  • Foto Number: ZAM-012

One of the two locks at Miraflores on the Panama Canal. You can see an Ecuadorian ship from Guayaquil. The manoeuvre from one lock to the other takes about an hour. The operation requires about 100 000 tonnes of water. Each lock gate is nine metres high and weighs 750 tonnes. The ship is pulled on both banks by 50-tonne tractors - they are called mulas (mules). The tractors are equipped with 75 HP electric motors. The Panama Canal measures 82 kilometres and covers an area of 250 square kilometres. It usually takes six to eight hours to navigate. This waterway was opened in 1914. Since the opening of the extension, which began in 2007, on 26 June 2016, ships with 14,000 TEU can pass through it. To date, more than one million ships of all types from all over the world have used it. - 1977

  • Keywords:
    Central America Panama Panama canal ship sluice ship

Website © 2025 pb + StratLabs
Copyright © Estate of Maximilien Bruggmann for all photos. Any use for commercial purposes prohibited.
flag flag flag flag